VW Passat repair


+ 1. Ekspluatatsiiya of the car
+ 2. Maintenance
- 3. Engines
   + 3.1. Petrol engines of configuration R4
   + 3.2. Petrol engine of configuration of VR6
   - 3.3. Diesel engines
      3.3.1. Technical characteristics
      3.3.2. General information
      3.3.3. Installation of the piston of the cylinder No. 1 in VMT
      3.3.4. Check of a compression in cylinders
      3.3.5. Gear belt of the GRM drive
      3.3.6. Mechanism of a tension of a gear belt
      3.3.7. Cogged pulley of the camshaft
      3.3.8. Cogged pulley of a bent shaft
      3.3.9. Pulley of an intermediate shaft
      3.3.10. Belts of the drive of auxiliary units
      3.3.11. Cover of a head of the block of cylinders
      3.3.12. Replacement of an epiploon of the camshaft
      3.3.13. Replacement of an epiploon of an intermediate shaft
      3.3.14. Replacement of epiploons of a bent shaft
      3.3.15. Replacement of an epiploon of a forward cover of a bent shaft
      3.3.16. Head of the block of cylinders
      3.3.17. Check of work of hydraulic pushers
      3.3.18. Flywheel
      3.3.19. Replacement of support of the power unit
      3.3.20. Oil case
      3.3.21. Oil pump
      3.3.22. Top casing of the AFN engine
      3.3.23. System of prestarting heating of diesel engines
      3.3.24. Glow plugs
+ 4. Cooling system
+ 5. Power supply system
+ 6. System of ignition
+ 7. Coupling
+ 8. Transmission
+ 9. Drive of forward wheels
+ 10. Suspension brackets
+ 11. Steering
+ 12. Brake system
+ 13. Wheels and tires
+ 14. Systems of heating, ventilation and conditioning
+ 15. Electric equipment
+ 16. Body
+ 17. Electric circuits



ed639308




Repair Volkswagen Passat B3-B4/Passat B3-B4>> Engines>> Diesel engines>> Replacement of an epiploon of the camshaft
Carry out removal of an epiploon of the camshaft in the following order:
– on the AFN engine remove the top casing of the engine;
– disconnect the plug from the electromagnetic valve of a stop of the engine;
– take off auxiliary driving belts;
– remove pulleys of auxiliary driving belts and an external casing of a GRM belt;
– install the piston of the first cylinder in the provision of VMT and take off a GRM belt;
– if it is established, remove the mechanism of a tension of a GRM belt and a pulley of the camshaft;
– you otverinit screws and remove the internal casing of a GRM belt established on the block of cylinders;
– uncover a gochlovka of the block of cylinders (see section 3.3.10);

Fig. 3.68. Head of the block of cylinders: 1 – a head of the block of cylinders, 2 – laying of a head of the block of cylinders, 3 – the directing valve plug, 4 – a forward cover of the bearing of the camshaft, 5 – a bolt of fastening of a head of the block of cylinders, 6 – a maslootrazhatelny plate, 7 – laying of a cover of a head of the block of cylinders, 8 – a cover of a head of the block of cylinders, 9 – a plate, 10 – a stopper of an oil-filling mouth, 11 – the union of the valve of the regulator of ventilation of a case


– you otverinit two nuts and remove a forward cover 4 bearings of the camshaft (see fig. 3.68 );
– take a camshaft epiploon.
Carry out installation of an epiploon of the camshaft in the following order:
grease a new epiploon of the camshaft with pure engine oil and establish to the place of removed;
apply a thin film of sealant on the interfaced surfaces of a forward cover of the bearing of the camshaft, then establish a cover on a head of the block of cylinders and wrap nuts the required moment;
establish a cover of a head of the block of cylinders;
establish an internal casing of a gear belt and pulleys;
establish a GRM belt and adjust its tension;
establish an external casing of a GRM belt;
establish auxiliary driving belts and adjust their tension.